Our meeting was in two parts. The first part was a discussion about the water infrastructure in town and the Byron Master Plan. The Plan is a great opportunity to start addressing flooding, pollution and stormwater problems at the town centre.
After all, the Town Clock is the lowest part in the catchment and the narrow entry point to the Butler St Drain. (Then) John Sparks presented his plan, which we used as discussion starters. The talking points raised help focus ideas about what is needed in town. (The discussion is not to be seen as a blanket endorsement of the Sparks Plan).